Blog

Posted on 15 September 2013 at 12:10 am (CET)
Category: General
Posted on 15 September 2013 at 12:10 am (CET)
Category: General

Today I made some thicker cables so I can test with some more power tomorrow. Top speed won't really be high with just 20-24V but will probably have some more torque since I can push more amps through these cables.

Was quite some work to make them the right size and to put the cable shoes on them. But I bought an hydraulic crimping tool a while ago specifically for this so it went reasonably well.

E-Streetquad Last preparations for testride


Also put some heat shrink around the cable shoes. Might be using these cables more often when I'm bored.

E-Streetquad Last preparations for testride


Then I had a whoopsie moment. Was planning to place the sensorplate for the display on the shorter cable. But I already put both cable shoes on it so I couldn't get the cable through the sensor anymore. Since I didn't have any extra cable shoes of this size I just cut the cable, placed the sensor and soldered it. I just couldn't get the cable hot enough so it's pretty badly soldered. Only the outside really, on the inside there's no solder and the wires are just pressing against eachother. For longtime use I definately wouldn't accept this. But just for testing tomorrow it should be fine.

E-Streetquad Last preparations for testride


The 2 car batteries are also on, I'm fully charging one of them now. Tomorrow I'll just have to put a strap around them to keep them in place. The Chinese really did make a good frame. Both of the batteries just fit exactly in width. There really is no space left between them, not even 0,1 mm I think. Like they knew I was going to do this when they welded this frame.

E-Streetquad Last preparations for testride


So tomorrow will be another exciting day hopefully without problems. In any case the quad bike's ready, just still have to fully charge the 2nd battery tomorrow and connect the cables.

E-Streetquad Last preparations for testride

Posted on 14 September 2013 at 10:00 am (CET)
Category: General
Posted on 14 September 2013 at 10:00 am (CET)
Category: General

See here the biggest moment of the project up untill now.

It's alive!


Just on low power ofcourse with such small wires, 20V 50A maximum so 1kW. But I didn't really see 50A, think the wires are just too small for that and the 9Ah battery of the quad bike was empty pretty quick.
I also saw that the wheels are quite unbalanced. It could be many things though so I don't know what is causing it exactly. Could be that the rear axle is bent just a little, common problem with Chinese quad bikes. Could also be something with the bearings in the bearing house. And the wheels themselves aren't balanced yet either. It's also a straight axle and there's no weight on it, could be that it's bent a little because of that.

Tomorrow probably with some more power and hopefully a short testride.

Posted on 14 September 2013 at 12:02 am (CET)
Category: Controller
Posted on 14 September 2013 at 12:02 am (CET)
Category: Controller

Today I wanted to grind off a bit of those 2 mounting points so the mounts would be sitting straight. But I found out this wasn't possible since those 2 points were already even with the frame. So I found another solution, just adding a ring on the other 2 points and they sit perfectly straight now.

E-Streetquad Controller mounts fitted straight and wiring for testride


E-Streetquad Controller mounts fitted straight and wiring for testride


Another picture now everything's really attached. Eventually the aluminium enclosure will be placed around the controller. Can't leave it open like this later on with the lithium batteries, quite deadly if you'd touch the 2 terminals where the cables of the batteries are connected to.

E-Streetquad Controller mounts fitted straight and wiring for testride


Today I spent most of the time on the wiring to be able to start testing. Cut almost everything out of the old wire harness and tidied it up a bit with a piece of wire loom. Otherwise the wires could cause some problems if they'd hit the chain.

E-Streetquad Controller mounts fitted straight and wiring for testride


And something else happened today but I'll save that for tomorrow.

Posted on 13 September 2013 at 12:28 am (CET)

Very good news today, the mounts for the controller and a new plate for the RPM sensor are done and also fitted them already. Been working on it for the whole evening. I do have to grind off 2 mounting points on the frame though since the mounts are pointing inward a bit. But it's an easy fix, will do it tomorrow. Couldn't make any noise anymore here so late in the evening.

First off I removed the rear swingarm again so I could place all the new stainless steel bolts on the motor mount and to place the new plate for the RPM sensor.

E-Streetquad Controller mounts done and refitting everything with stainless steel bolts


Difference between my own handmade plate and the new plate for the RPM sensor. Makes mine look pretty bad.

E-Streetquad Controller mounts done and refitting everything with stainless steel bolts


Here are all the stainless steel bolts in the motor mount and the plate for the RPM sensor fitted.

E-Streetquad Controller mounts done and refitting everything with stainless steel bolts


The motor back on the rear swing arm, also with the new stainless steel bolts. Looks a lot better than with the black steel bolts which were already rusting.

E-Streetquad Controller mounts done and refitting everything with stainless steel bolts


The inside bolts on the adaptor for the rear sprocket are also stainless steel now. Needed fine metric for this. I think there's a lot of tension on these bolts now though, don't know if this will cause any problems. Apparently they're just a tiny bit thicker than the original bolts or something. Really needed a lot of force to fasten them. Also added the last 2 cap nuts.

E-Streetquad Controller mounts done and refitting everything with stainless steel bolts


And now the mounts for the controller. I'll really keep saying this, great company who made this (Geraets Metaalbewerking). It really turned out very nicely. A lot better looking than the mounts I originally wanted. And it's definately strong enough, I think it can take at least 10x the weight of the controller.

E-Streetquad Controller mounts done and refitting everything with stainless steel bolts


Here you can see it fitted on the quad bike with the controller already on it.

E-Streetquad Controller mounts done and refitting everything with stainless steel bolts


E-Streetquad Controller mounts done and refitting everything with stainless steel bolts


But it's all still loose, I first have to grind off a bit of the 2 front mounting points so the mounts will be sitting straight. Otherwise there will be too much tension on the mounts or the frame if I were to attach it like this. But it'll all be good, another day tomorrow. Here you can see that they're not sitting straight right now.

E-Streetquad Controller mounts done and refitting everything with stainless steel bolts


Here's the whole picture again. Rear end of the quad bike is pretty full now.

E-Streetquad Controller mounts done and refitting everything with stainless steel bolts


I also lubed the chain. And the rear swingarm's bearings didn't have much grease on them so I greased them some more. There's still something squeeking near the rear axle though when I turn the wheels, I think the bearings. But I'll be replacing them by SKF bearings anyway so I'll just leave it like this for now.

This weekend I'll definately have my first testride.

Posted on 11 September 2013 at 10:33 pm (CET)
Category: General, Parts
Posted on 11 September 2013 at 10:33 pm (CET)
Category: General, Parts

Today I also fitted the nerfbar and hielguards. Even though it won't be going fast, I think it's a bit safer than just having the foot pegs. Also fitted the saddle. Just had to place the rear fender as well otherwise the saddle would bend too much. Don't know how strong it is. Also screwed a wooden board on the frame for the batteries to sit on, just don't think I can fit 2 car battery's on there. But I'll see when it's ready. Also tightened the wheel nuts, almost forgot they were still pretty loose.

E-Streetquad Some more preparations for testride and more fastening materials


And I received some more stainless steel bolts, nuts and rings. Now I just still need the controller mounts.

E-Streetquad Some more preparations for testride and more fastening materials